keyword=swing shift summary
16:14 current scan run 20nA continue with Left Run 2100, Right Run 21190
16:14 current scan run at 20nA ended, start run at 40nA with Left Run
2101; Right Run 21191
17:15 current scan run at 40nA ended, start run at 60nA Left Run 2102;
Right Run 21192
17:50 current scan run at 60nA ended with 0.6M events
turn slow raster on
start Tungsten Calorimeter 50nA run with Left Run 2103; Right Run 21193
18:40 Tungsten Calorimeter 50nA run ended
turn slow raster off
current scan run at 1uA
19:30 Control access to fix Right D1 power supply
20:00 D1 power supply io not fixed, back to beam permit. Alex is doing
slow raster scan, see his log entry for details
21:10 start septum study, will run at P0=1.7003GeV 1uA beam, change
septum from 475,455,445,435,425,415A, 1M events each, see seperate log
entry for detail
22:40 septum study finished except last run with only 0.3M events
beam is down due to MCC problem.
22:50 change septum back to 475A
23:50 beam is back