Melissa, Ryan and I worked on the right HRS Fastbus crates today. By the
end of our work, we had ROC's 1 and 2 operational again and tested 9 TDCs
and 5 ADCs with the SFI test codes. All of these modules, which Jack
thought were fine, we were able to address and verify. Also the SFI
module from ROC 1 is fine along with it's CPU. The CPU from ROC 2 also
appears to be fine. We have not checked the ROC 2 SFI, which Jack
suspects to be bad. Perhaps we can get Alexandre to test it with the
portable crate tomorrow.
When testing the crates on the right arm, we were not able to successfully
check modules on the top crate, which used to be ROC 2. This is the BiRa
crate that had the power supply cables crossed. We are now using the
middle crate for ROC 2, which appears to work fine.
Tomorrow, I would like to fully implement ROC 1 and 2 with ADCs and TDCs
and test the right HRS DAQ to see if we can take cosmics. We will also
check the Physics Storage Building for Fastbus back-plane cards that we
need for the left HRS.
We do have one spare SFI that was used previously for the intel CPU
tests from last Fall. We can use this one to replace the bad one in
ROC 4.