    User name V. Sulkosky

    Log entry time 18:54:23 on February 13, 2012

    Entry number 362171

    This entry is a followup to: 362168

    keyword=SFI and Fastbus status on Right Arm

    Melissa, Ryan and I worked on the right HRS Fastbus crates today.  By the 
    end of our work, we had ROC's 1 and 2 operational again and tested 9 TDCs
    and 5 ADCs with the SFI test codes.  All of these modules, which Jack 
    thought were fine, we were able to address and verify.  Also the SFI
    module from ROC 1 is fine along with it's CPU.  The CPU from ROC 2 also 
    appears to be fine.  We have not checked the ROC 2 SFI, which Jack 
    suspects to be bad.  Perhaps we can get Alexandre to test it with the 
    portable crate tomorrow.
    
    When testing the crates on the right arm, we were not able to successfully
    check modules on the top crate, which used to be ROC 2.  This is the BiRa
    crate that had the power supply cables crossed.  We are now using the 
    middle crate for ROC 2, which appears to work fine.
    
    Tomorrow, I would like to fully implement ROC 1 and 2 with ADCs and TDCs
    and test the right HRS DAQ to see if we can take cosmics.  We will also 
    check the Physics Storage Building for Fastbus back-plane cards that we 
    need for the left HRS.  
    
    We do have one spare SFI that was used previously for the intel CPU 
    tests from last Fall.  We can use this one to replace the bad one in 
    ROC 4.
    


    A copy of this log entry has been emailed to: rom,segal,rbziel,vasulk,melissac,doug,bogdanw,kalyan,camsonne,slifer