• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name jpchen

    Log entry time 14:04:06 on March 03, 2012

    Entry number 363043

    keyword=Moller Starts

    Moller starts now with beam tuning first. It will be mainly 0.1-0.2 uA, possibly with a short run with higher current (up to 0.5 uA). Detector check out will be on-going at the same time, set at Q.E. condition. Will need to set back to elastic before optics starts.