• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Chao/Kalyan

    Log entry time 14:43:31 on March 05, 2012

    Entry number 363816

    This entry is a followup to: 363679

    keyword=Switch the dE1L and E1L signal cable

    Kalyan checked the TDC correlation plots. It looks that dE1L and E1L signal cable is switched accidentally. I switched the signal cable back. From the scaler, it looks good now. I will check it with beam.