Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Chao/Kalyan
Log entry time 14:43:31 on March 05, 2012
Entry number 363816
This entry is a followup to: 363679
keyword=Switch the dE1L and E1L signal cable
Kalyan checked the TDC correlation plots. It looks that dE1L and E1L
signal cable is switched accidentally. I switched the signal cable back.
From the scaler, it looks good now. I will check it with beam.