    16:00 Start shift with controlled access in progress. Accelerator
    investigating chicane magnets, finding a calibration problem.
    18:00 Beam ready, doing harp scans
    20:00 MCC takes beam to do checks with local dump at target
    20:45 beam back, more harp scans
    21:00 MCC asks to do a controlled access to check for hot spots along the
    beam line.
    22:00 Access ends, resuming harp scans.
    23:35 Beam goes away for Hall B tuneup.
    23:55 Steering beam in the hall, not usable yet.
    24:00 Shift ends with waiting for usable beam for more harp scans and