User name Ole Hansen
Log entry time 00:08:03 on March 08, 2012
Entry number 364337
keyword=Swing Shift Summary
16:00 Start shift with controlled access in progress. Accelerator
investigating chicane magnets, finding a calibration problem.
18:00 Beam ready, doing harp scans
20:00 MCC takes beam to do checks with local dump at target
20:45 beam back, more harp scans
21:00 MCC asks to do a controlled access to check for hot spots along the
beam line.
22:00 Access ends, resuming harp scans.
23:35 Beam goes away for Hall B tuneup.
23:55 Steering beam in the hall, not usable yet.
24:00 Shift ends with waiting for usable beam for more harp scans and
further activities on run plan.