Shift workers:
SL:C. Gu
TO&3rd: R. Zielinski
00:22 wait beam tuning
01;10 beam is back, move target to C12, James continues with the target alignment test
01:39 Move on to the delta scan, start with right arm delta -3.5%
01:48 Cycled Q2,Q3 for left arm and start delta scan of left arm with delta -4.0%
02:13 Set left delta to -3%
02:34 Set left delta to -2%
02:39 Set right delta to -1%
02:55 Set left delta to -1%
03:12 Set left delta to 1%
03:19 Set right delta to 2%
03:34 Set left delta to 2%
03:49 Set left delta to 3%
03:54 Set right delta to 3.5%
04:15 Finish delta scan, take an escorted access to move the sieve slit out
04:40 start to do acceptance study with sieve out
04:45~05:45 Beam is down for about 1 hour
06:00 Turn on fast raster (2x2), take acceptance study data
06:21 Turn on slow raster and set it to be, take another point for acceptance study
06:32 Acceptance study finished, moved the target to top NH3 and start to take dilution factor study data
07:10 Asked the MCC to turn off the beam and do a full survey of the hall to prepare today's restricted access
08:00 Hall is under survey