Shift Leader: Yawei Zhang
TO: Yuxiang Zhao
3rd: Lamiaa El. Fassi
4:00 starting shift with controlled access
4:10 techs ramp up Q1
4:25 LHRS Q2 tripped, follow the procedure on the wall to bring it back
4:46 MCC finished their work on magnet
5:40 LHRS VDC top and botom HV tripped
5:52 Everyone is out of the hall
6:00 Chris needs to do more work on target
7:00 Chris out of the hall
7:05 ramp up target magnet
7:30 ready for the beam, call MCC and been told they are not ready to tune beam, waiting......
10:05 MCC starting to tune beam
10:50 MCC called beam off for 20min
11:30 MCC starting to tune beam again
11:30 Hall C change the Half wave plate from out->in