Log entry time 00:08:42 on March 28, 2012
Entry number 367382
keyword=Swing Shift Summary
Swing Shift Summary
SL: Melissa Cummings
TO: Konrad Aniol
3rd: Sophia Iqbal
Expert Help: Tobias Badman
16:00 Start of Shift, Hall is in restricted access
20:00 Work in hall is done, called MCC for sweep
20:23 Cycling left and right dipole to 2.251 GeV/c
20:45 Sweep is done, Jack needs to do visual check of septum power
supplies, Hall goes to controlled access
20:50 Begin to ramp up target magnet
21:00 Jack is out of hall - going to beam permit
21:50 C100 tripped off. Also having trouble with FSD for Hall
A...thinks its just a software problem
22:50 MCC called to say they are still having a problem with the FSD. An
expert has been called in to fix it. Also, one of the fz magnets is done
and they are having trouble connecting to it remotely. An expert is
looking at it but they may need an access to fix it.
23:09 MCC needs to check out a power supply for one of the FZ magents.
Hall is going to controlled access.
23:50 Back to beam permit
24:00 End of Shift, MCC trying to tune beam into the hall