    User name R. Zielinski

    Log entry time 23:39:15 on March 28, 2012

    Entry number 367865

    keyword=Swing Shift Summary

    4:20 Stopped beam and started ramping magnet down in prep for controlled access. Jack is going to look at Right Septum power supply and also tighten a few bolts on septum. 4:25 Ramped septum down 4:45 Magnet all the way down. Called for escorted access. 5:45 Ramping magnet back up to 2.5 T. Jack done with escorted access. Alexander still in hall. 5:50 Beam permit 6:00 MCC sending TUNE beam 6:10 Requested 100 nA CW beam, resuming optics 9:46 BSY dipole trip, beam down 11:30 Requested escorted access to remove sieve slits. Optics done