    User name yawei

    Log entry time 15:59:21 on March 29, 2012

    Entry number 368102

    keyword=Day Shift Summary

    Shift Leader: Yawei Zhang
    TO: Elena Long
    3rd: Johan Sjoegren

    8:00 starting shift with no beam
    8:36 call MCC to ask the status of beam, they need one more hour
    9:30 MCC tuning beam into Hall
    9:35 beam is back, starting to take P=2.072GeV production run at 50nA
    11:53 MCC inform beam will be down ~30mins to fix some injector problem
    12:00 beam back, continue production
    12:10 MCC inform beam will be down ~20mins
    12:30 beam back, continue production
    13:37 MCC inform beam is down
    14:43 beam back, continue production
    15:37 MCC inform beam is down


    Production Run#
    P=2.072 GeV

    LHRS Run# RHRS Run# Third Arm Run#
    3456 22491 40502
    3457 22492 40504
    3458 22493 40505
    3459 22495 40507
    3460 22496 40508
    3461 22497 40509/40510
    3463 22499 40513
    3464 22500 40514