    SL: Katherine Myers
    TO: Patricia Solvignon-Slifer
    SW: Yawei Zhang
    
    08:20 - Moving to top target, doing a baseline
    08:40 - Baseline is done, starting to polarize the target
    08:50 - Switch from trying to polarize negative to positive
    09:00 - Polarization 35%. Ask for beam back!
    09:07 - Taking production data
    09:54 - Increased current to 65 nA
    09:55 - Noticed beam positions have been slightly off since last night
    10:21 - Decreased current to 50 nA
    10:49 - Passive IHWP moved IN (Regular IHWP still OUT)
    11:05 - Passive IHWP moved OUT, Regular IHWP moved IN
    12:00 - Stopped beam for target anneal
    13:25 - Target anneal done
    13:25 - Left arm and septum are at the elastic setting for some thickness
    runs
    13:35 - Bleed-through measured to be 0.5%
    13:50 - Starting Moller.
    16:00 - Still working on Moller
    
    Runs taken at momentum setting 1.792 GeV
    
    IHWP OUT, top cup positive polarization
    3495/22529 - production
    3496/22530 - production, tried to change prescale but DT 25%, short run
    3497/22531 - production, went up to 65 nA in middle of run
    3498/22532 - production, back at 50 nA
    3499/22533 - production
    
    IHWP IN
    3500/22534 - production
    3501/22535 - production
    3502/22536 - production 
    
    Third Arm runs
    IHWP OUT: 40545-40549
    IHWP IN: 40550-40551
    
    Elastic setting thickness (?) runs
    3503 - top unpolarized
    3504 - bottom unpolarized