Log entry time 00:11:55 on April 1,2012
Entry number 368798
keyword=Swing Shift Summary
Shift Workers:
Chao Gu(SL), Yuxiang Zhao(TO), Johan Sjoegren(3rd)
16:00 Shift start, Kalyan is doing some beam position check
16:35 Beam position check finished, go on to production, HRS momentum setting to 1550Mev, septa current to 488/539.5A, We are using the bottom NH3 target, the polarization is about 28.5%
17:30 Beam is still not stable
18:00 Target experts came to do the target anneal
20:35 Target experts finished their work, we move back to production
21:10 Finished production on 1550MeV, start to move HRS setting to 1441MeV
21:50 RHRS is settled, so we start to do the dilution test
22:35 Finished dilution runs, we will move the target to TOP NH3 target and polarize it
23:00 Move on to production
23:30 Kalyan suggest to decrease the slow raster size to avoid the extremely high rate on 3rd arm (it looks like the beam is hitting something). Move the raster size to 1.8cm and do a test on 3rd arm. Rate looks good. So Kalyan decide we should keep this setting.
24:00 Keep production
Production Run# for 1550MeV
3545/22578/40587
3548/22580/40590
Dilution Run# for 1441MeV
Empty: 3550/22581
Carbon: 3552/22582
Dummy: 3553/22584
Production Run# for 1441MeV
3549/40591 (right arm not settled)
3554/22585/40595