I believe the reason for the scrapping is the position at 1H01. We moved it from 0.0 to -3.0 to drop the rate. Previous to the moeller we were running with 1H01.XPOS around -3 to -4. It is relatively easy to ask OPS to move the beam at 1H01.XPOS to -4mm and then compensate past this to keep it at the proper spot on the H05A/B bpms.