NEXT
Make New Entry,
Make Followup Entry
User name M. Cummings
Log entry time 15:58:20 on April 01, 2012
Entry number 368994
keyword=Day Shift Summary
Day Shift Summary
SL: Melissa Cummings
TO: Ryan Zielinski
3rd: Garrett Josemans
08:00 Start of shift, beam is down so MCC can reboot IOC.
10:50 MCC called to say the IOC problem was apparently a network issue.
While
solving the network problem, a "control stopper" was automatically put
into place, causing some magnets/RF to trip off. Techs are currently
working to fix the magnet/RF issues, then MCC will try to put beam back
in the halls.
02:00 MCC called to say they will send tune beam
02:30 Beam is back - checked 3rd arm scaler rates and beam position using
spot++. Back to production data!
03:25 Hall C changed HWP to IN
04:00 Taking production data. Settings still set for p=1.3405
Runs Taken:
p=1.3405
3581/22609/40621 HWP OUT
3584/22612/40622 HWP OUT
3584/22613/40623 HWP IN, beam trip during run
3485/22613/40624 HWP IN