    User name M. Cummings

    Log entry time 15:58:20 on April 01, 2012

    Entry number 368994

    keyword=Day Shift Summary

    Day Shift Summary
    
    
    SL: Melissa Cummings
    TO: Ryan Zielinski
    3rd: Garrett Josemans
    
    
    08:00 Start of shift, beam is down so MCC can reboot IOC.
    10:50 MCC called to say the IOC problem was apparently a network issue. 
    While
    solving the network problem, a "control stopper" was automatically put
    into place, causing some magnets/RF to trip off.  Techs are currently
    working to fix the magnet/RF issues, then MCC will try to put beam back
    in the halls.  
    02:00 MCC called to say they will send tune beam
    02:30 Beam is back - checked 3rd arm scaler rates and beam position using
    spot++. Back to production data!
    03:25 Hall C changed HWP to IN
    04:00 Taking production data.  Settings still set for p=1.3405
    
    
    
    Runs Taken:
    
    p=1.3405
    3581/22609/40621  HWP OUT
    3584/22612/40622  HWP OUT
    3584/22613/40623  HWP IN, beam trip during run
    3485/22613/40624  HWP IN