    User name Chao

    Log entry time 00:10:36 on April 2,2012

    Entry number 369105

    Followups:

    keyword=Swing Shift Summary

    Shift workers:
    Chao Gu(SL), Jie Liu(TO), Johan Sjoegren(3rd)

    16:00 Shifts start, go on production at P0=1341MeV, IHWP IN
    16:00 Moved the beam position back to the setting on the white board since the beam position does not recover after the down time.
    20:05 Finished production on 1341MeV. We Moved the HRS setting to 1267MeV
    20:40 Start the dilution test on 1267MeV
    21:15 Finished the dilution test, move on to production
    24:00 Shift end. Still taking production data at P0=1267MeV

    Production Run# 1341MeV
    3585(5.0M)/22613(4.3M)/40623
    3586(7.9M)/22614(6.5M)/40624
    3587(9.4M)/22616(5.1M)/40625
    3588(7.4M)/22617(6.3M)/40626
    3589(10.3M)/22618(8.3M)/40627
    3590(6.4M)/22619(5.1M)/40628
    3591(6.8M)/22620(5.7M)/40629

    Dilution Run# 1247MeV
    Empty: 3593/22621/40631
    Carbon: 3594/22622/40632
    Dummy: 3595/22623/40633

    Production Run# 1247MeV
    3592(5.8M)/40630
    3596(7.8M)/22624(6.2M)/40634
    3597(7.4M)/22626(5.9M)/40635
    3598(2.5M)/22627(1.9M)/40636
    3599(8.8M)/22628(7.1M)/40637