User name pzhu
Log entry time 08:45:58 on April 07, 2012
Entry number 371118
keyword=owl shift summary
1:50 done for 1.931GeV/c, start to do dilution for this setting
2:25 done for dilution, move target back NH3, Changed the momentum to 1.294
2:35 left arm momentum is locked, start to take production run for 1.294
4:00 MFZ1H05B magnet tripped, mcc are trying to fix it
4:20 mcc asked for controlled access to fix the FZ magnet
4:40 target magnet ramped down for mcc people to go to the target area
5:10 hall status go back to beam permit, target magnet is ramping up
5:25 ready for beam, check beam position again
5:40 beam position didn't changed ,moved back NH3 for production
5:45 start for production
8:07 finished 1.294 production, start dilution
8:37 finished dilution, changed momentum to 1.203