    User name pzhu

    Log entry time 08:45:58 on April 07, 2012

    Entry number 371118

    keyword=owl shift summary

    1:50 done for 1.931GeV/c, start to do dilution for this setting
    2:25 done for dilution, move target back NH3, Changed the momentum to 1.294
    2:35 left arm momentum is locked, start to take production run for 1.294
    4:00 MFZ1H05B magnet tripped, mcc are trying to fix it
    4:20 mcc asked for controlled access to fix the FZ magnet
    4:40 target magnet ramped down for mcc people to go to the target area
    5:10 hall status go back to beam permit, target magnet is ramping up
    5:25 ready for beam, check beam position again
    5:40 beam position didn't changed ,moved back NH3 for production
    5:45 start for production
    8:07 finished 1.294 production, start dilution
    8:37 finished dilution, changed momentum to 1.203