Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Boeglin
Log entry time 00:05:44 on April 8,2012
Entry number 371414
keyword=Shift Summary
16:00 beam centering
16:40 beam centered,
16:45 start dilution runs
17:00 set left arm for PF runs
17:54 left arm set to production running, 3rd arm DAQ SLOW
access to the hall for a reset.
18:50 start production, without 3rd arm
20:00 completed p = 1.119 switch to p = 1.041
20:00 Hall access to fix 3rd arm problem
20:34 Hall closed ask for beam
20:45 start production at new setting
21:30 the students noticed that the current in the right septum was off (affected 22903 and the previous right arm run). Was corrected new run number: 22904)
22:40 completed p = 1.041 settings production runs. Start dilution runs
23:05 asked MCC for bleed through, reported 0%.
23:10 completed dilution runs for p = 1.041 switch to p = 0.968
23:43 completed dilution runs for p = 0.968 right arm was still changing slightrly ( 1- 2 MeV/c).
Packing Fraction runs:
Top: 3864
Bottom:3865
Dilution Runs:
p = 1.119
C12: 3860
dummy: 3861
Home: 3862
p = 1.041
C12: 3875
Dummy: 3876
Home: 3877
p = 0.968
C12: 3879
Dummy:3880
Home: 3878