Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Jixie
Log entry time 19:29:02 on April 09, 2012
Entry number 372179
keyword=Target insert vertical offset for 1.706 GeV, 2.5T, 90deg target field
Through my simulation the beam vertical offset at the target insert is
-0.7mm, corresponding to -20669 encoder steps. I have already asked the TO
to use this offset in target operation gui.
A copy of this log entry has been emailed to: jmaxwell, pzhu, ckeith,camsonne,jpierce,jrm,jpchen,slifer