User name Jixie
Log entry time 21:12:10 on April 09, 2012
Entry number 372187
keyword=Status update
We have taken the 2.3GeV g2p production data with very high efficiency in
he weekend. We managed to take all the kinematics points in the plan and
took
one extra point (1.940 GeV/c) with 120 M data.
On Monday MCC changed the linac energy to 415 MeV. Chicane had been moved to
run 4. check details here:
http://hallaweb.jlab.org/halog/log/html/1204_archive/120409134403.html
Melissa worked at T2 issue (rate is too high). The timing looks normal.
She plan to test MLU in Wednesday.
http://hallaweb.jlab.org/halog/log/html/1204_archive/120409182138.html
Vince worked on the raw data files overwritten issue. We could not solve
this problem. But the coda now can kill itself whenever it try to
overwrite an exist file.
Target group did another anneal. Might change the target material in
Wednesday during the 10-hour-beam-study.
Kalyan changed the 3rd arm position for taking elastic proton for the 1.7
GeV beam energy.
Future plan:
1) Once beam recovered, we will do harp scan, BPM calibration
2) Then take optics data for 1.7 GeV 2.5T 90deg target field
3) Restricted access on Wednesday during beam study. Do anneal in
Wednesday, might change target material if needed.
4) Do moller measurement in Thursday morning
A copy of this log entry has been emailed to: g2p@jlab.org