User name G.Kumbartzki
Log entry time 23:52:27 on April 09, 2012
Entry number 372321
keyword=Swing shift summary
At start of shift sweep of hall on progress.
16:30 status controlled access.
The left septum magnet started tripping and the right followed suit.
Not sure what was the egg and what the chicken.
Jack Segal came in at 20:30.
First came the chicken; the right septum magnet tripped on being set
alone.
22:20 News from MCC, they have injector problems and it may take a while.
The shift ended with still no solution to the septum magnet power supply
problem and no beam anyway.