    User name G.Kumbartzki

    Log entry time 23:52:27 on April 09, 2012

    Entry number 372321

    keyword=Swing shift summary

    At start of shift sweep of hall on progress.
    16:30 status controlled access.
    The left septum magnet started tripping and the right followed suit.
    Not sure what was the egg and what the chicken. Jack Segal came in at 20:30.
    First came the chicken; the right septum magnet tripped on being set alone.
    22:20 News from MCC, they have injector problems and it may take a while.
    The shift ended with still no solution to the septum magnet power supply problem and no beam anyway.