    keyword=Run plan for Owl Apr 10

    The Bigbite power supply is not working tonight. The inject is also not ready yet. Here is the run plan for tonight:

    1) Pengjia will do rasters calib, BPM calib and harp scan, 4 hours in total 2) If Pengjia finish all the above before 7 AM, call Jixie and Sasha in to do moller, otherwise Pengjia can take the beam to do other beam line test till 8AM then requested for control access. I will talk to PD to arrange expert to check septum power supply.