At the beginning of the shift the hall was open.
Asked for beam permit
18:00 beam tuning underway
Beam tuning with raster checks
21:50 ready to take optics measurement.
After running for a short while realized the sieve slit data looked wrong
and asked for an escorted entry
Indeed the sieve slit was only "half in"
Shift ended doing septum scans.