8:00 optics completed. Asked for controlled access to remove sieve slits
8:35 ask for beam permit, target is polarizing
8:40 set slow raster to 1V ask for fast raster on and request beam.
8:55 start production, left at p = 1.691, right p = 1.589
11:04 Beam trip due to ion chamber trip in dump area.
11:55 beam sill off, move carbon hole into place.
12:10 beam back, star centering procedure
12:50 centering completed start polarizing
13:15 start production
13:45 beam trip due to IOC reboot in MCC
14:02 beam back, positions OK continue production
16:00 still in production,
Total of 170M events for p = 1.589 kinematics
Do not forte to do the dilution runs for p = 1.691 (left arm)