3rd DT is high because the beam is hitting something during run 41115. The spot_3 do not look good. There is no need to change prescales on 3rd arm. Please check BPMs or reduce slow raster size. The rate should be < 4KHz and DT < 20%, otherwise there is a good possibility that beam spot on target is not good.