Data taking for Po = 1.4045 about 50% done at start of shift.
Continue with this setting.
Current run sequence 4319/23283/41158
17:59 End of production runs followed by dilution runs
A check of the raster size was performed.
Repeat of momentum setting 1.494 for the left arm only
At 19:32 Jixie asked to move the beam 3mm to the right.
The position changes were finished at 20:11 and we continued production
runs for the 1.494 momentum at the left arm.
Finally settled for a beam position 2mm to the right and slow raster
1.8mm
21:08 changed momentum on left arm to 1.3203
Run sequence 4341/23299/41189
Production running rest of shift,