    User name G.Kumbartzki

    Log entry time 23:58:18 on April 13, 2012

    Entry number 374125

    keyword=Swing shift summary

    SL: G. Kumbartzki, TO: Toby Badman, 3rd: Christine McLean

    Data taking for Po = 1.4045 about 50% done at start of shift.
    Continue with this setting.
    Current run sequence 4319/23283/41158
    17:59 End of production runs followed by dilution runs
    A check of the raster size was performed. Repeat of momentum setting 1.494 for the left arm only
    At 19:32 Jixie asked to move the beam 3mm to the right.
    The position changes were finished at 20:11 and we continued production runs for the 1.494 momentum at the left arm.

    Finally settled for a beam position 2mm to the right and slow raster 1.8mm
    21:08 changed momentum on left arm to 1.3203
    Run sequence 4341/23299/41189
    Production running rest of shift,