    SL: Min Huang, TO: Robert Michaels, 3rd: Mohamed Hafez
    
    0:00 Shift starts with production at p0=1.3203 GeV.
    
    0:10 Shift leader from last shift asked MCC to adjust beam current to
    50nA, then beam position changes a little. Did a spot_3 check, looks OK.
    
    2:40 p0=1.3203 GeV finished with 227M events, move HRS to p0=1.2410GeV.
    
    3:20 HallC changed IHWP to be OUT.
    
    4:00 We noticed the bcm up/down scalers show zero rate, and replay
    results are zeros. Later, Pengjia and Chao confirmed that it is a label
    issue, and they have connected to other channels.
    
    5:05 Beam trip for a few minutes. Asked MCC to do a bleed-through
    measurement. The result was zero.
    continue with production 
    
    7:06 Hall C changed IHWP to be IN.
    
    8:00 Production going on
    
    Good runs:
    p0=1.3203 GeV
    4349/23308/41198 --- 4357/23316/41206 HWP IN
    
    p0=1.2410
    4358/41207, HWP IN
    4359/41208, HWP OUT
    4360/23318/41209 -- 4370/23328/41219 except 4364/23322/41213, HWP OUT
    4371/23329/41220, 4372/23330/41221, HWP IN