    User name jmaxwell

    Log entry time 22:23:07 on April 14, 2012

    Entry number 374615

    keyword=Day Summary, Plans

    We had a very quiet, productive day. The target polarization sat quite high, just below 30%, and lasted longer than we had anticipated. We went ahead with an anneal to boost the polarization again. This should be the last anneal before the material switch on Tuesday.

    We took beam all day, with the exception of the two hour break to anneal. In an quick access during the anneal, the ARM found a hot spot after the septum, which explains the scrapping we were seeing in the 3rd arm.

    Day Summary: 0:00-19:00: Production 19:00-21:20: Anneal and ARM survey