16:00 continue production on p = 1.666.
16:40 MCC called to interrupt beam for a short moment to check the reason for a declining beam current.
17:05 beam back, position OK, continue production
18:35 finished kin p = 1.1666 do dilution runs
19:00 finished dilution runs. Target will be annealed. Set left arm to elastic and right arm to the new momentum: p = 1.0966. Start of target anneal
21:10 anneal completed, waiting for hall to close.
21:30 re-center the beam
22:00 start packing fraction measurement
22:15 completed packing fraction for top and bottom cells. Set left arm to p = 1.0966
Target is being polarized
22:40 target is polarized (P = 37%) start production
First new production run: L: 4409 R: 23362 3: 41264
Completed kinematics
235.7M total events in p = 1.1666
Current kinematics p = 1.0966 27M events