    User name Boeglin

    Log entry time 00:06:18 on April 15, 2012

    Entry number 374647

    keyword=Shift summary

    16:00 continue production on p = 1.666.

    16:40 MCC called to interrupt beam for a short moment to check the reason for a declining beam current.

    17:05 beam back, position OK, continue production

    18:35 finished kin p = 1.1666 do dilution runs

    19:00 finished dilution runs. Target will be annealed. Set left arm to elastic and right arm to the new momentum: p = 1.0966. Start of target anneal

    21:10 anneal completed, waiting for hall to close.

    21:30 re-center the beam

    22:00 start packing fraction measurement

    22:15 completed packing fraction for top and bottom cells. Set left arm to p = 1.0966

    Target is being polarized

    22:40 target is polarized (P = 37%) start production

    First new production run: L: 4409 R: 23362 3: 41264

    Completed kinematics

    235.7M total events in p = 1.1666

    Current kinematics p = 1.0966 27M events