• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name jmaxwell

    Log entry time 20:57:04 on April 18, 2012

    Entry number 376323

    keyword=Plan For Tonight

    We will continue to take data as we have all day, until 6:20am tomorrow 
    morning.  At this point, we should stop beam and the microwaves, and let 
    the target operator get a measurement of T1 at 1.6K (Turn off the roots 
    pumps in order, but leave the pumping valves closed).  Take 10 minutes of 
    data watching the polarization decay without the microwaves.
    
    With the T1 observed, we will then move to carbon-40 and take data with 
    the exact same settings as we had on the bottom cell all day.  Take this 
    until beam is gone at 7:00am.  The bottom target will be relaxing at 1.6K 
    during this time, speeding along the TE
    
    At 7:00am, move back to the bottomcell and take a very good TE.  This 
    should be finished before 9:00am.  When it's finished, we'll ramp down 
    the magnet to allow the chicane move.
    
    The SL should call for restricted access after beam is done at 7:00am, 
    but there's no great hurry, as we'll be taking the TE then.