• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Jixie

    Log entry time 14:27:13 on April20,2012

    Entry number 376628

    keyword=It takes about 30 minutes to change right dipole from -3.5% to 0%

    I decided to do beam position scan befoer delta scan such that we can save 45 minutes to drain LHe. During taking data for beam position scan Dustin will drain the LHe.
    I have set the right dipole to 0%. It took 30 minutees. I Will set left arm to 0% soon.


    FIGURE 1