Summary
00:10 Beam Position Scan Done. Acceptance study Part I started.
00:40 Acceptance study part I finished. Delta scan started.
03:40 Delta scan done. Student expert tested the rasters while R-HRS settling.
04:30 Pointing study finished. Asked MCC for escorted access to move the sieve out.
05:00 Sieve out.
05:20 Beam back. Acceptance study part II. Energy has shifted from 1.151 to 1.157 GeV.
05:40 Optics Done. Move to production(R) / Packing fraction(L). Taking bottom cell.
06:05 L-HRS VDC HV tripped during the configuration change. Recovered.
06:30 Left Septum tripped and not recovering. We are running
07:45 Asked for access to reset L-Septum.
08:00 Waiting for access.
Run List
- Acceptance Study Part I, Sieve IN, C12_40, P0 = 1.1571
- 4739 / 23653 : Rasters ON, 0.8 M
- 4740 / 23654 : Rasters OFF, 0.3 M (take these as 0% delta scan)
- 4742 / 23656 : Rasters OFF, 0.3 M (take these as 0% delta scan)
- Delta Scan, Sieve IN, C12_40
- 4740, 4742 : 0% / 1.1571 GeV
- 4743, 4744 : 1% / 1.1454 GeV
- 4745, 4746 : 2% / 1.1339 GeV
- 4747, 4748 : 3% / 1.1223 GeV
- 4749, 4750 : 4% / 1.1107 GeV
- 4751, 4752 : -4% / 1.2033 GeV
- 4753, 4754 : -3% / 1.1917 GeV
- 4755, 4757 : -2% / 1.1801 GeV
- 4758, 4759 : -1% / 1.1686 GeV
- 23654, 23656 : 0% / 1.1571 GeV
- 23657, 23658 : 2% / 1.1339 GeV
- 23659, 23660 : 3.5% / 1.1165 GeV
- 23663, 23664 : -3.5% / 1.1975 GeV
- 23669, 23670 : -2% / 1.1801 GeV
- (Optional) Raster Study (while R-HRS taking delta scan)
- Pointing, Sieve IN, CH2, P0 = 1.1571
- L-HRS : 4772-4774
- R-HRS : 23676-23678
- Acceptance Study Part II, Sieve OUT, C12_40, P0 = 1.1571
- 4777, 4778 / 23681, 23682 : Rasters OFF
- 4779, 4780 / 23683, 23684 : Rasters ON
- Packing Fraction on Left P0 = 1.1511
- Dilution on R-HRS only
- 23685, 23686 : Home Target
- 23687 : Dummy
- 23688, 23689 : C12_40