Day shift summary
SL: Hari Khanal TO: Ryan Duve 3rd: Christine McLean
8:00 Shift started for production runs with p0 = 1.0171 GeV and I = 50nA , 1/2 wave plate out. 8:45 Running problem of 3rd coda 10:52 Moving target to NH3 top for production with new kinematic 0.9561 GeV/c and I = 50nA , 1/2 wave plate still out , polarization 33.1 %
11:12 MCC stoped beam because they have problem with IOC signal. 11:30 we got beam and once dilution was done , we started taking production data. Production run summary P0 = 1.0171 GeV, NH3 Top, 260.7 M subtotal events from previous shift 4833 / 23723 : 7M /6.7 (274.4M) 4834 / 23724 : 7M /6.7 (288.09M) 4835/ 23725 : 7/6.7 M (301.8M) 4836/23726 : 7/6.7 M (315.5M)
P0 = 0.9561 GeV, NH3 Top, I = 50nA event number in Million 4840/23730 0.04/0.7 (1.01) 4841/23731 7/6.7 (14.71) 4842/23732 7/6.8 (28.51) 4843/23733 3.2/3.0 (34.71) 4844/23734 7.0/6.8 (48.51) 4845/23735 7.0/6.8 (62.31) 4846/23736 7.0/6.8 (76.11) 4847/23737 7.0/6.8 (89.91) 4848/23738 6.6/7.0(103.509) 4849/23739 7.0/6.7(117.21) 4850/23740 7.0/6.7(130.91) 4851/23741 7.0/6.7(144.61)