• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Yoomin

    Log entry time 08:09:32 on April 24, 2012

    Entry number 378350

    keyword=Owl Shift Summary

    Workers

    Yoomin Oh(SL), Pengjia Zhu(TO), Jie Liu(3rd)

    Summary

    00:00 Shift starts, P0=0.7464.

    00:35 HWP flipped IN.

    01:00 Production at 0.7464 GeV finished. Dilution.

    01:40 Packing fraction measurement with L-HRS elastic setting for top/bottom cell.
              While R-HRS is set to next production setting.

    02:10 Start production for 0.7017 GeV

    03:00 Rate check for bleed through.

    04:50 HWP OUT.

    05:40 Production P0=0.7017 GeV done with 119M total events. Dilution.

    06:10 P0=0.6596 starts.

    08:00 P0=0.6596, subtotal around 50M
              Over.

    Run List