User name jpchen
Log entry time 10:06:09 on April24,2012
Entry number 378385
keyword=Production from 8-10, beam off 10-12.
Day shift started with continue production at P0=0.6596 GeV/c.
Target polarization dropped to about 26%, beam polarization measure last even was 89%.
Scaled events needed is 114*(84/89*31/26)**2=144M.
We got 137M.
Beam off as scheduled for 10:00-12:00. Target annealing starting now.