Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jpchen
Log entry time 13:55:07 on April24,2012
Entry number 378446
keyword=dilution runs and beam cenetr
After beam back, we did the dilution and at the same time centered beam slightly:
First with Empty/Home, beam poistion looks fine, took dilution run.
Then 12C, saw both spot_3 and spot_++ that beam has hot spot at the bottom. Asked for meve beam down by 0.5 mm, took another run. Rate in 3rd imporved significant, spot_3 and spot_++ improved, but still some hot spot. Asked for another 0.5 mm lower in Y. Took another 12C run
looked much better. Still slight hot.
Moved to Dummy?corss hair adn asked beam abck with 0.25 mm down. No hot spot. Took two dilution runs.
The final beam position in Y is -4.1mm in BPMB and -4.6mm in BPMA.