User name Chao
Log entry time 16:15:01 on April 25, 2012
Entry number 378998
keyword=Day shift summary
Shift workers:
Chao Gu(SL), Navaphon Muangma(TO), Eric Jensen(3rd)
08:00 Shift starts with production at 1.082GeV momentum setting.
08:50 3rd arm saw a >10k rate. We did a 10 min quick study on beam
position and slow raster size. Change back to what we used on Saturday
(0.62VX0.80V). New beam position is BPMA(1.2,-5.0) BPMB(0.3,-4.0)
09:00 Hall C is down for 15 min. Our beam energy changed during this
time. Talk with MCC, they suggests us to wait Hall C back. Beam energy is
recovered at 9:15
10:50 Finished production on 1.082GeV, moved HRS momentum to 1.0063GeV
11:00 Start production at 1.0063GeV
12:35 Bleed through test, the result is 0.33%
14:00 Moved to Top cell, polarized it to 45% and continue with production
16:00 Shift ends. We were still taking 1.0063GeV momentum production data.
Production Run# at 1.082GeV (115M in total)
5038/23899/41676
5039/23900/41677
/23901/41679
/23902/41680 (LHRS CODA problem)
5044/23903/41681
5045/23904/41682
Production Run# at 1.0063GeV
5047/23905/41684
5048/23906/41685
5049/23907/41686
5050/23908/41687
5051/23909/41688
5052/23910/41689
5053/23911/41690
5054/23912/41691
5055/23913/41692
(several short runs during the beam trip)
5058/23916/41695