    User name Sarah

    Log entry time 00:08:04 on May 05, 2012

    Entry number 382281

    keyword=Swing Shift Summary

    Swing Shift Summary



    Leader: Sarah Phillips
    Target: Hovhannes Baghdasaryan
    Third: Christine McLean


    Summary

    The shift started with no beam since the previous shift was just finishing the back out from the Moller measurements. MCC then called to say that they couldn't deliver beam to the hall because the Moller target was in, but after an investigation, it was found that the Moller target was out, and that the real problem was that the IOC associated with this FSD had to be rebooted. We then did the dilution runs we needed for this setting, and started production running. After a few hours of production running, both septa tripped off. Dustin and Jessie went down into the hall to investigate the trip and found that the water line for the big bite power supply ruptured which dumped water all over the place before they got the valves turned off. Ed arrived and headed down, and the clean up commenced.

    Photos of water in the hall: elog 1782244.



    Timeline



    Notes for the next shift:




    Runs Taken

    Beam Position Studies:

    Dilution (both arms):
    Left

    Right


    Production:
    Left
    Total: 32.3 M

    Right
    Total: 25.2 M

    Pedestal:
    Left

    Right