    User name R. Zielinski

    Log entry time 16:01:38 on May 6,2012

    Entry number 382707

    keyword=Day Shift Summary

    08:05 IHWP is now IN.
    08:30 James called in and says there is a planned anneal when target polarization drops below 65%.
    09:10 Beam trip
    09:15 Beam Back
    12:20 Magnet current dropped by .5A.
    12:36 Recentering target field around 213MHz
    14:00 Planning to anneal at 2:30. Target Polarization now ~65%
    14:40 Beginning anneal
    14:40 Pengjia also begins Tungsten Calorimeter runs
    15:00 Pengjia finishes Tungsten Calorimeter run
    15:00 Alexandre asks for an escorted access to check on a parasitic experiment
    15:30 Back to beam permit but still waiting on anneal
    16:00 Still waiting anneal to finish. James estimates another 30-45 minutes