• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name M. Cummings

    Log entry time 03:30:53 on May 10, 2012

    Entry number 383549

    Followups:

    keyword=Yves suggestion: lower beam current when moving beam position

    Yves just called from MCC.  He suggested that when changing the beam position during BPM 
    calibrations we should lower the beam current to ~0.5 uA (pulsed beam) until the beam is settled 
    at the new position.  As James mentioned in his post (383545) we should keep an eye on magnet 
    flow levels and the low dump ion chamber whenever they are adjusting the beam position.
    


    A copy of this log entry has been emailed to: pzhu, camsonne