• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name averett

    Log entry time 15:54:42 on May 10, 2012

    Entry number 383682

    keyword=Day Shift Summary

    Day Shift Summary

    8:00, Hall in controlled access, 8:30 Spectrometers set to 2.251 GeV/c central momentum. 9:30 Tuning Beam into Hall A

    12:48 Still checking beam position, raster, etc. Not sure about correct target position/angle. Target magnet current having unexpected small drops in magnet current. Target experts are investigating.

    3:07 Controlled access to adjust target magnet power supply. 3:30 continuing to study beam centering issues

    3:45 Jack Segal to begin monitoring R septum in preparation to raise current for optics runs.

    3:50 R septum power supply in regulation=on. Current is 962.8 A.