    User name V. Sulkosky

    Log entry time 23:02:17 on May10,2012

    Entry number 383779

    keyword=HRS's Set to 2.251 GeV/c

    We have set both HRS's to 2.251 GeV/c for the final optics runs
    with sieves OUT. While we wait for the controlled access to be over,
    the right septum regulator is OFF with the right septum current set
    to 600 Amps.

    The left arm was going down in momentum from 2.299 GeV/c, and hence
    was not cycled. The right arm Q2 and Q3 were cycled to 1400 Amps.


    FIGURE 1

    FIGURE 2