    User name Chao

    Log entry time 00:08:33 on May 13, 2012

    Entry number 384483

    keyword=Swing Shift Summary

    Shift Workers:
    Chao Gu(SL), Yuncheng Han(TO), Herun Yang(3rd)

    16:00 Shift starts. We just start to take production data at 1.414GeV.
    16:15 Hall C flipped IHWP to OUT.
    17:15 Start to cycle Q2,Q3 on LHRS and set it to 2.2279GeV.
    17:45 Start to drain LHe form the target nose to prepare for anneal. Meanwhile Pengjia is taking a tungsten calorimeter calibration.
    18:10 Hall is in controlled access. Dustin start target anneal. Alex and Jack also goes down to the Hall to do some work.
    20:15 Hall C flipped IHWP to IN.
    20:30 Start to polarize the TOP cell.
    21:05 Target is polarized. We called for beam and then took a packing fraction run on TOP cell. We also start to production at 1.414GeV with RHRS.
    21:15 Move LHRS back to 1.414GeV to continue production.
    24:00 Shift ends. We are still taking production data at 1.414GeV.

    Production run# at 1.414GeV (Goal:50M)

    Run# IHWP  Pt EventsEffectiveTotal
    6031/24698IN67.53.8M/3.6M6.0M6.0M
    6032/24699OUT65.05.5M/6.6M9.1M15.1M
    6038/24701IN77.56.4M/7.0M14.3M29.4M
    6039/24702IN75.06.3M/5.9M12.2M41.6M


    Packing fraction run# at 2.227GeV

    Run#TargetEventsComment
    6033Bottom1.5MBefore anneal
    6034Top1.5MBefore anneal
    6036Top1.0MAfter anneal