    Shift workers:
    Chao Gu(SL). Jie Liu(TO), Jechiel Lichtenstadt(3rd)

    00:00 Shift starts. We do not have beam because some injector RF issue.
    01:40 Beam is back. Continue to take production data.
    03:40 The polarization of BOTTOM cell dropped to 65%, so we increased the beam current to 100nA.
    04:00 Start dilution runs.
    04:40 Start to polarize the TOP cell.
    04:45 The target can not be polarized. We called the target expert to look into this problem.
    06:00 James found that the NMR tune for TOP cell is not good. So we asked for an access to fix this problem.
    06:30 James fixed the problem. Hall back to beam permit and we start to polarize the TOP cell.
    06:55 Left septa tripped.
    07:05 IHWP to IN by Hall C.
    07:20 Try to call Jack and we can not get him. So RC called Alex to power cycle the septa.
    07:40 Escorted access to reset the septa.
    08:00 There is a problem with the septa power supply. We are still in controlled access when shift ends.

    Production run# at 2.8200GeV (Goal: 127M)

    Run#IHWPPtEventsEffectiveTotal
    6135OUT70.07.07.036.1
    6136OUT67.07.06.442.5
    6137OUT65.57.06.148.6
    6139OUT65.07.06.054.6
    6140OUT58.07.04.859.4

    Dilution run# at 2.8200GeV

    Run#TargetEvents
    6141Empty1.03
    6142Carbon1.65
    6143Dummy1.03


    Production run# at 2.2017GeV (Goal: 47M)

    Run#IHWPPtEventsEffectiveTotal
    24741OUT68.55.04.815.3
    24742OUT66.52.32.017.3
    24743OUT65.02.52.119.4
    24744OUT58.04.22.922.3

    Dilution run# at 2.2017GeV

    Run#TargetEvents
    24745Empty0.52
    24746Carbon0.86
    24747Dummy0.54