08:00-10:35 Controlled access to fix the left Septum power supply (replace fuse);
10:35 Change Left HRS momentum to 2.3422 GeV/c (we will work our way up);
10:35 Target in Home position in preparation for Moller;
10:45 Both Septa set to 100A for Moller;
from about 12:20 to 14:00 we did not have beam;
14:47 Beam IHWP changed from IN to OUT;
16:00 Moller still on-going.