To save time, we only did a quick check on NH3 target for beam recovery. We asked MCC to move the beam position back to 1H01(-0.1,0.5) and 1H05A(1.3,-3.2) since Moller measurement changed the beam position and then took spot++ runs on left arm. The spot++ plots looks similar as what we got before Moller measurement and it looks clean. So we directly go to production after that