• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Chao

    Log entry time 08:04:13 on May 16, 2012

    Entry number 385281

    keyword=Owl Shift Summary

    Shift workers:
    Chao Gu(SL), Robert Michaels(TO), Jechiel Lichtenstadt(3rd)

    00:00 Shift starts. We are still waiting for MCC to bring beam back. Meanwhile we start to ramp up the HRS and target magnets.
    01:15 MCC call us to say they are ready to send us beam. We are waiting for our target to be polarized.
    01:45 Target is ready. We call MCC to send tune beam.
    02:20 We ask MCC to move the beam position back to 1H01(-0.1,0.5) and 1H05A(1.3,-3.2). Took several spot++ runs, and the final plots looks clean. So we go back to production.
    03:20 C100 cavity 2L25 tripped. We do not have beam.
    03:40 Beam is back.
    03:55 RHRS finally settled at 2.2017GeV. Start production immediately on RHRS.
    05:10 IHWP to IN by us.
    07:10 Start to move RHRS to 2.0696GeV.
    08:00 Shift ends. RHRS is still moving to 2.0696GeV. LHRS is still taking production data for 2.3422GeV. We finished 2.2017GeV during the shift and collect 45.7M events with LHRS at 2.3422GeV.

    Production run# at 2.3422GeV (Goal:50M)

    Run#IHWPPtEventsEffectiveTotal
    6148OUT75.07.08.08.0
    6150OUT75.07.08.016.0
    6151OUT70.07.07.023.0
    6152IN69.07.06.829.8
    6153IN65.05.95.134.9
    6154IN63.07.05.540.4
    6155IN61.07.05.345.7

    Production run# at 2.2017GeV (Goal:22M)

    Run#IHWPPtEventsEffectiveTotal
    24749OUT73.55.05.55.5
    24750OUT70.03.83.89.3
    24751IN69.05.04.914.2
    24752IN65.05.04.318.5
    24753IN63.05.04.022.5