Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Zhihong Ye
Log entry time 23:48:32 on May16,2012
Entry number 385449
keyword=Swing shift Summary
4:00pm Continue taking data on HRS-L at 2.4918 GeV/c and HRS-R at 2.0696 GeV/c
4:10pm Per Hovhannes's request, increase beam current from 80nA to 100nA.
4:30pm Beam Energy was shifting +-2MeV during the last three hours and caused the beam positions changed and hit the beam pipe, since MCC was bringing up Hall-C. Beam Energy stablized after Hall-C back.
4:55pm 1HWP out
5:20pm Control Access requested to change Target MicroWave
5:30pm Back to Beam Permit and start polarizing target
6:20pm Target Polarized. Taking data
8:45pm HRS-L changed to 2.6508GeV/c
9:10pm 3rd Arm HVs off. Chao turned them back on
11:40pm HRS-R finished data taking at 2.0696. Change Momentum to 1.9454. James works on target aneal. Pengjia works on BCM calibration
12:00 All activities above on going.
Run#(L/R) Events#(L/R)
L=2.4918, R=2.0696
6163/24759 5.7M/3.3M
6164/24760 JUNK
6165/24761 2.7M/1.5M
6166/24762 2.1M/1.2M
6167/24763 8M/4.3M
6168/24764 7.8M/4.2M
L=2.6508, R=2.0696
6169/24765 7M/3.65M
6170/24766 6M/2.6M
6171/24767 5.85M/2.57M
6172/24768 5.9M/3.86M
6173/ 3.2M/