Timeline:
0:00 start anneal and tungsten calorimeter calibration
0:30 finished tungsten calorimeter calibration
1:25 finished anneal and start positive polarize on bottom
2:00 finished polarize for bottom 80.7%, start production
4:55 finished 2.6508 setting in left arm, tried to arise septum current
to 1050 for 3.0GeV but failed, a while later septum tripped
5:20 asked for escorted access, jack go to the hall to check if it is
the limit of septum power supply. right arm septum is working.
5:47 go back beam permit, jack checked power supply and found 210V is
the limit for power supply (960A). will go back production soon.
5:55 go back production, right arm continue 1.9454, left arm continue
2.82
Run Record during
shift:
Left Arm:
Run |
HWP |
Eves |
Scaled Events |
Total Events in one
P0
setting |
P0 |
Comment |
6175 |
OUT |
7 |
8.2 |
35.6 |
2.6508 |
Production |
6176 |
OUT |
7 |
7.4 |
43 |
2.6508 |
Production |
6177 |
OUT |
5.2 |
5.3 |
48.3 |
2.6508 | Production |
6178 |
IN |
7 |
6.4 |
54.7 |
2.6508 | Production |
6179 |
IN |
7 |
6.2 |
60.9 |
2.6508 | Production |
6181 |
IN |
6.25 |
6.61 |
70.41 |
2.82 |
Production |
6182 |
IN | 7 |
6.9 |
6.9 |
2.8 |
Production |
6183 |
IN |
7 |
6.2 |
13.1 |
2.8 |
Production |
6184 |
IN |
2.8 |
Production |
Right Arm:
Run |
HWP |
Eves |
Scaled Events |
Total Events in one P0 setting | P0 |
Comment |
24770 |
OUT | 2.85 |
3.36 |
3.36 |
1.9454 |
Production |
24771 |
OUT | 2.65 |
2.8 |
6.16 |
1.9454 | Production |
24772 |
OUT | 2.04 |
2.1 |
6.26 |
1.9454 | Production |
24773 |
IN |
2.7 |
2.5 |
10.76 |
1.9454 | Production |
24774 |
IN |
2.67 |
2.37 |
13.13 |
1.9454 | Production |
24775 |
IN |
3.24 |
3.06 |
16.19 |
1.9454 | Production |
24776 |
IN | 5 |
5.44 |
21.63 |
1.9454 |
Production |
24777 |
IN |
5 |
4.44 |
26.07 |
1.9454 |
Production |
24778 |
IN |
1.9454 |
Production |