0800 Production running LHRS P0=2.80 GeV/c, RHRS P0=1.9454 GeV/c
0830 Begin Dilution runs, 100nA,Keep RHRS P0=1.9454 GeV/c but change septa current. Change LHRS P0 (and left septa) for each dilution setting.
1133 Finished LHRS P0=2.2017 GeV/c dilution runs. Request controlled access for Jack Segal to work on septum power supplies.
15:00 Karl has provided a new run plan based on the expected success of the septum work going on. Set LHRS P0=3.0 GeV/c, RHRS P0=1.9454 GeV/c
1552 Jack Segal reports the right septum power supply is connected to the left septum magnet. NOTE: You must now control the left septum magnet with the right septum power supply. Also note the readback current in the Hall A Tools Screen is showing in the RHRS. The right septum magnet is not connected anymore so it cannot be set.