    User name adaq

    Log entry time 16:07:07 on May 22, 1999

    Entry number 21363

    keyword=Beam Time Accounting
    Hall A

    5/22/1999 0800-1600
    Experiment #: E91-010
    Shift Leader: Holmes
    Shift Workers: Humensky, Urciouli

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    1 1 45 50 55 1 1 1 7.5
    Beam Available
    but Not in Use
    0 0 15 0 5 0 0 0 0.333333333333333
    Beam Not Available
    or Unacceptable
    0 0 0 10 0 0 0 0 0.166666666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 45 1 55 1 1 1 7.66666666666667
    Planned Config-
    uration Change
    0 0 15 0 5 0 0 0 0.333333333333333
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: We did a test at the injector with Matt Poelker that demostrated a linear dependence of Hall A current on Hall C current implying cathode charge limit effects are causing our current drop when Hall C is on. An RF zone lost HV, causing a brief down. Compton did some brief low-current scans.

    Data Entry by: Humensky